|
Our strong position in sugar
production is a direct result of our emphasis on the usage of modern
technology, energy efficient systems and research and development. Our
subsidiary, Triveni SRI has an agreement with SRI, which enables us to
equip our plants with modern equipments and process know-how. We have
installed Continuous Vacuum Pans (CVPs) developed by us in association
with SRI at our Khatauli and Deoband sugar mills. These CVPs consume
less steam for massecuite boiling and are therefore more efficient. We
have also installed a Syrup Clarification System (SCS) at Deoband and
Khatauli sugar mills for improvement in quality of the sugar.
We are also in the process of installing a Short Retention Clarifier
(SRC) at Khatauli sugar mill and plan to use the same in the new plants.
In a normal clarifier, juice is retained for approximately 150 minutes
while the SRC, takes 30 minutes for the same. The reduced time prevents
inversion of sugar and thereby improves sugar recovery and quality. At
our proposed Sabitgarh unit we plan to use VFDs to rotate the mills,
which will reduce energy consumption and minimise energy requirement at
lower operating load.
|


|