Case Study: Eastern Zone
Problems Faced: A 23 MW gearbox for Gas turbine power
plant supplied by Westinghouse originally and Plant had lost direct
contact with the gearbox vendor and had no other option to find other
sources who were capable to take care of the interchangeability.
Solution offered by Triveni : Triveni experts visited
the site and suggested replacement of gearinternals and testing the same
in the original gearbox casing to save the cost, while offering
interchangeability.
Implementation: Triveni took the dimensions of the
gearset and new internals were manufactured and assembled and tested in
the original casing to ensure interchangeabiliy
Customer Experience: The gearbox has been put into
operation and on full load by our engineers. ASEB has found localised
service and the gearbox was put into operation.
|


|