VII.
COGENERATION
At Khatauli a Co-generation Plant of 23.0 MW is being installed
| - Boiler |
- 120 T |
Capacity 87 Kg M²
IJT make : Bagasse fired |
| - Power Turbine |
- 23.0 MW |
Make -Skoda |
VIII.
GENERAL
Final molasses storage tanks, number, type and capacity of each tank:
| A. |
2 Nos. M.S.Tanks 19,000 Qtls Cap. |
| B. |
1 No. M.S.Tanks 22,000 Qtls Cap
|
| C. |
1 No. M.S.Tanks 48,000 Qtls Cap
|
| D. |
1 No. M.S.Tanks 80,000 Qtls Cap |
| E. |
1 No. M.S.Tanks 1,00,000 Qtls Cap |
| F. |
1 No. M.S.Tanks 60,000 Qtls Cap
|
| TOTAL = |
7 Nos. M.S.Tanks 3,48,000 Qtls Cap |